TRR-257

Reset all
303 Total Downloads
Name Sort descending Download Type Sort descending Download
Brochure

Reservoir roof refurbishment.

Case study
File
5.25 MB

Water treatment works.

Case study
11.55 MB

The existing asphalt roof at the Royal Albert Hall in London required an overlay with particular care to the expansion joints to allow for movement within the building. 

Case study
6.04 MB

Follmann Chemie corporate social responsibility report.

Certification

Waterproofing and protection.

Case study

Concrete roof refurbishment.

Case study
File
5.09 MB

The residential apartments at Eastland Homes requested a waterproofing and surfacing solution that would include both an insulated element, to improve energy efficiency and a durable waterproofing layer to their cantilever walkways.

Case study
2.52 MB

Car park refurbishment due to water ingress.

Case study
File
14.52 MB

Waterproofing solution for a stadium roof.

Case study
9.08 MB
Certification
2.04 MB
Certification
2.04 MB
Certification
2.04 MB
Certification
363.36 KB
Certification
401.99 KB